Scope of Work
The upgrade of Muirkirk Wastewater Pumping Stations A and B included demolition and removal of the existing electrical cabinets. Cianbro furnished and installed a new pump station building at each site, comprising of electrical distribution, ventilation, as well as pump control and monitoring equipment.
Project Details
- Cianbro performed the following:
- Furnished and installed new conduit and wire in each pump station
- Made pipe modifications in the flow meter vault
- Furnished and installed exhaust and supply fans along with duct for the wet wall
- Excavated and installed 9 feet, 10-inch by 11-feet, 10-inch concrete foundation for Station A and B
- Furnished and installed 60 feet SCAD Pole
- Installed (2) VFDs, Panelboard, Main Circuit Breaker, Wetwell Vent Monitor Control Panel, and (4) Terminal Panels
Lean, Innovative and Unique Project Solutions
The Muirkirk Wastewater Pumping Stations were small in size, therefore Cianbro had minimal room to perform work, which required efficient and effective pre-planning.