Beltsville, MD
Completed:
2016

Muirkirk Wastewater Pump Stations A and B Upgrades

Scope of Work
The upgrade of Muirkirk Wastewater Pumping Stations A and B included demolition and removal of the existing electrical cabinets. Cianbro furnished and installed a new pump station building at each site, comprising of electrical distribution, ventilation, as well as pump control and monitoring equipment.
Project Details
  • Cianbro performed the following:
    • Furnished and installed new conduit and wire in each pump station
    • Made pipe modifications in the flow meter vault
    • Furnished and installed exhaust and supply fans along with duct for the wet wall
    • Excavated and installed 9 feet, 10-inch by 11-feet, 10-inch concrete foundation for Station A and B
    • Furnished and installed 60 feet SCAD Pole
    • Installed (2) VFDs, Panelboard, Main Circuit Breaker, Wetwell Vent Monitor Control Panel, and (4) Terminal Panels
Lean, Innovative and Unique Project Solutions
The Muirkirk Wastewater Pumping Stations were small in size, therefore Cianbro had minimal room to perform work, which required efficient and effective pre-planning.
No items found.

Our Offices
Corporate Headquarters
P.O. Box 1000
Pittsfield, ME 04967
207-487-3311
info@cianbro.com

Email Us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.