Big Level Wind

Scope of Work
Cianbro worked as an EPC Contractor for the Balance of Plant (BOP) Services, constructing 25 wind turbines for a 90 megawatt wind farm project.
Project Details
  • Constructed nine miles of access roads, crane roads, and turbine pads
  • Constructed 25 gravity foundations at approximately 650-cubic-yards each
  • Installed 19, 3.6-megawatt wind turbines at 131.4-meter hub height by 137-meter rotor diameter
  • Installed 6, 3.6-megawatt wind turbines at 110-meter hub height by 137-meter rotor diameter
  • Installed approximately 61,000-circuit-feet of underground collection
  • Installed approximately two miles of double circuit and 1.5 miles of single circuit overhead collection
  • Constructed collection substation
  • Constructed three-breaker ring bus interconnection switchyard
  • Constructed an O&M building and 425-foot MET tower
Lean, Innovative and Unique Project Solutions

Due to the project being located in close proximity to several “high-value” streams, the project was constructed with adherence to extremely stringent environmental requirements. 

No items found.

Our Offices
Corporate Headquarters
P.O. Box 1000
Pittsfield, ME 04967
207-487-3311
info@cianbro.com

Email Us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.